Hub Airport — Energy Station Retrofit
The large terminal's central HVAC chilled-water and cooling-water system faces load that fluctuates strongly with flights and season. Full-condition optimisation was applied across leaving-water temperature, pump frequency, fan speed and cycles of concentration, integrated with an intelligent O&M platform for trend-based early warning.
Client name withheld under a confidentiality agreement. Only industry conditions and retrofit objectives are described here.
Project information
| Industry | Transport Hub |
|---|---|
| Owner / developer | Hub Airport (anonymised) |
| Scope of supply | Full-Condition Cooling Energy Optimisation |
| Delivery | 2024 |
The large terminal's central HVAC chilled-water and cooling-water system faces load that fluctuates strongly with flights and season. Full-condition optimisation was applied across leaving-water temperature, pump frequency, fan speed and cycles of concentration, integrated with an intelligent O&M platform for trend-based early warning.