Hub Airport — Energy Station Retrofit

The large terminal's central HVAC chilled-water and cooling-water system faces load that fluctuates strongly with flights and season. Full-condition optimisation was applied across leaving-water temperature, pump frequency, fan speed and cycles of concentration, integrated with an intelligent O&M platform for trend-based early warning.

Client name withheld under a confidentiality agreement. Only industry conditions and retrofit objectives are described here.

Project information

IndustryTransport Hub
Owner / developerHub Airport (anonymised)
Scope of supplyFull-Condition Cooling Energy Optimisation
Delivery2024

The large terminal's central HVAC chilled-water and cooling-water system faces load that fluctuates strongly with flights and season. Full-condition optimisation was applied across leaving-water temperature, pump frequency, fan speed and cycles of concentration, integrated with an intelligent O&M platform for trend-based early warning.

Discuss a similar project