Scheme Overview
The scheme covers device selection, gateway placement, commissioning workflow, and cloud platform onboarding — designed to bring 100 metering points online in 8 working days.
Key Steps
Day 1: site survey and gateway placement plan. Day 2–3: device procurement and pre-configuration. Day 4–6: installation and QR-code commissioning (40 meters per day). Day 7: verification and handover. Day 8: go-live.
ROI
Cost reduction: 60–80% on communications installation versus wired. Time saving: 60–70% versus wired. Ongoing O&M reduction: 30–40%. Payback: 12–18 months.